Speech at the Signing Ceremony for the Project Financing of Istanbul New Airport

Türkiye Recep Tayyip Erdoğan · President of Turkey

19 October 2015 · Signing Ceremony for the Project Financing of Istanbul New Airport · Istanbul, Türkiye

Context
Erdoğan addressed bankers and businessmen at the signing ceremony for €4.6 billion in financing for the new Istanbul Airport on October 19, 2015.
Main themes
Istanbul New Airport project, project financing and loan signing, Build-Operate-Transfer model, Turkish aviation sector growth, Turkey's 2023 targets and 2053 vision, public and private bank cooperation, economic impact and job creation, Istanbul as global aviation hub, Turkish civil aviation competition, infrastructure investment milestones
Duration
~19 min
63rd percentile
Words
2,258
63rd percentile
Sentences
108
67th percentile
Readability
51
66th percentile
Grade
11.2
34th percentile
Syntax
2.96
41st percentile
Vocabulary
2.21
52nd percentile

Translated from Turkish

Content
Actors
Style

The broad sphere of national life a sentence belongs to. Every sentence has an Arena, so it is the denominator the other indices are read against.

Other
  • Economic 55%55%
  • Ceremonial 19%19%
  • Geopolitical 7%7%
  • Institutional 6%6%
  • Social 6%6%
  • Environmental 5%5%
  • Technological 3%3%
  • Not in focus 0%

108 sentences in 39 paragraphs

Dear Prime Minister,

Valuable representatives of the Turkish banking sector,

Esteemed businessmen,

Dear brothers and sisters;

I greet you with my heartfelt feelings, with love and respect.

Today, we are gathered to witness one of the most important and historic moments for the future of our country. We are taking another critical step together in our project to bring the world's largest capacity airport to Istanbul. This airport, which will be realized through the 'Build-Operate-Transfer' model, was tendered on May 3, 2013, and its foundation was laid on June 7, 2014. Today, we are holding the signing ceremony for a total loan financing of 4.6 billion euros, of which 3.5 billion euros will be provided by public banks and 1.1 billion euros by private banks.

I hope that this project, which is one of the leading investments in reaching the 2023 targets and 2053 vision of the Republic of Turkey, will be beneficial for our country, our nation, and the entire region. I express my gratitude on behalf of myself and my nation to all public and private sector banks that have taken responsibility by providing financial support for the realization of this project. I wish success in advance to all contractor firms involved in this project, which will symbolize a transition to a different league for the Turkish contracting sector.

This project will open the doors to a new era not only for our banking and contracting sectors but also for the Turkish civil aviation sector. Once all phases of this project are completed, Turkey, especially Istanbul, will become a global hub in world air traffic.

When we took office in November 2002, Sabiha Gökçen Airport was non-existent, and there were no flights. Istanbul was far behind compared to today. Of course, by addressing this and bringing about this mobility, Sabiha Gökçen has now become unable to meet the demand. Steps were taken regarding the construction of a new runway. Similarly, Istanbul has also become unable to meet the demand. Additional runway investments were made there as well. Along with all this, the number of our aircraft has also become insufficient to meet the demand.

When only Turkish Airlines was operating, this number increased to two, then three, four, five, six, and continued. All of this was very important in showing how crucial competition is in the Turkish aviation system and how far we have come.

I thank my Lord for allowing us to experience this unforgettable moment despite sabotage, obstruction, and attempts to slow us down. Just as we have crossed a critical threshold with this signing ceremony today, I believe we will also realize the opening of the airport.

Dear brothers and sisters;

To better understand the importance of the project for our country, I would like to reiterate some figures that our Prime Minister and Minister have just provided. The new airport in Istanbul is being built on an area of approximately 76.5 million square meters located between the Yeniköy and Akpınar settlements on the European side of Istanbul along the Black Sea coast. This area was not chosen randomly, as some claim. The ecological balance of the region, wind data, and assessments of natural and artificial obstacles were determined. During my tenure as Prime Minister, I, along with Minister of Transport Binali Yıldırım, visited the area several times by helicopter with technical colleagues. We even made the decision by examining the ecological studies on-site.

With an investment cost of 10 billion 247 million euros and a total rental fee of 22 billion 152 million euros plus VAT, this project will reach a total of 32 billion 399 million euros, making it the largest investment in this field for our country. You know we used to call them 'crazy projects'; well, this is the most significant one that has come to life.

In the last 10 years, our country has invested 3.5 billion euros in the aviation sector through equity, public, and private cooperation. The investment cost of this project corresponds to approximately ten times the size of the investments made in the past ten years. With this project, which will be realized without spending a single penny from the state treasury through the 'Build-Operate-Transfer' model, the state will earn over 26 billion euros in rental fees and VAT.

The third airport project consists of a total of four phases. According to the established schedule, the first phase of the new Istanbul airport is expected to be operational in the first quarter of 2018. With the commencement of the first phase investments, an average of 80,000 additional jobs will be provided during the construction period, and with the full operation of the airport, this number will rise to an average of 120,000 annually.

The first phase of the project includes a terminal building with a capacity of 90 million passengers per year and three north-south runways. God willing, when the first phase becomes operational, the airport will be able to accommodate two aircraft landing simultaneously, which is currently not possible anywhere else. Additionally, large-bodied aircraft like the Airbus A-380, which cannot land at our existing airport, will be able to land here comfortably.

When all phases of the project are completed in 2028, the annual passenger capacity will reach 150 million. Atatürk Airport, which has served Turkish and world aviation since 1953, accommodating 57 million passengers annually, can no longer meet the demand.

Together with Sabiha Gökçen, Istanbul's passenger capacity is just over 80 million. In 2016, more than 93 million passengers are expected to use the airports in Istanbul. These figures alone are sufficient to demonstrate the immense need for the new airport.

I would also like to emphasize one point: Contrary to certain groups that cannot digest the project, this airport will be an example in terms of environmental sensitivity worldwide. This airport has been designed to be self-sufficient in energy, environmentally friendly, nature-friendly, and accessible.

Once the new airport is completed, it will be the largest in the world in terms of passenger capacity and will remain one of the world's leading airports for many years to come.

Dear friends,

For those who want to see how a service to the public is a service to God can transform this country, they should look at the last 12 years of our country. The last 12 years of Turkey is a period of leap where what was said to be 'impossible' has been achieved, and what was deemed a dream has been realized one by one.

In the period we have left behind, Turkey has witnessed the transformation of air travel, which was a luxury for most of our citizens, into a means of transportation for the public. Those who used to travel by bus between cities now find that prices have reached a level where they say, 'I can fly' and have started to travel by plane. Currently, there are 55 airports operating in our country. When we took office, this number was 26; it has increased from 26 airports to 55. In 2002, when this number was 26, no one could have imagined it. There were provinces where people said, 'Will there be an airport in Şırnak, in Muş, in Iğdır, in Hakkari, in Ağrı?' and thankfully, they have seen that these airports have been built.

We have also realized a project like Ordu-Giresun Airport, which has no equivalent in Europe and only two counterparts in the world, as our Prime Minister mentioned earlier. That is, an airport built over the sea. Despite terrorism, all intimidation and sabotage attempts, and threats, we have built Selahaddin Eyyubi Airport in Hakkari. God willing, by 2023, we will have increased the number of airports in our country to 60. To undertake large projects, you need to have great ideals and great goals.

Imagine that you can reach an airport within half an hour from your home; this is an expression of how quickly you can travel between cities. Because we will evaluate the understanding that 'time is money' with this.

Thank God, Turkey has now become a country that makes plans and projects on a global scale. We need to evaluate the economic policy here. We are a country that aspires to be a leader in almost every field, not just on land roads, not just in high-speed trains; in defense industry, education, health, justice, security, energy, environment, housing, and more. Turkey, which was entirely dependent on external sources in the past, is now a country that meets its own needs, and even goes beyond that to produce, export, and achieve firsts in many areas. Every target we reach is a new beginning for us. Every prayer we receive from our citizens, every expression of 'May God be pleased with you' is our most important source of motivation.

We certainly see that the confidence gained from the strengthening of Turkey's economy and democracy has disturbed some people. We are also well aware that this discomfort is expressed through very different tools and methods. We know very well the true intentions, the real troubles, and the actual messages behind the reasons that are used as excuses and exploited.

I would like to express once again: Turkey's 90-year history is, in a way, the history of these struggles. The path of Turkey has always been obstructed by a group inside that has become accustomed to winning without producing or working, more than by other states. Idealist politicians, businessmen, and industrialists who believe in the potential of this country and say we can do it have been targeted by smear campaigns and labeled as dreamers.

Late Menderes, late Özal, late Erbakan as politicians, Nuri Demirağ, Vecihi Hürkuş as idealist industrialists and engineers, and the Devrim automobile as the first step of hope have all been targets of this lobby. Anyone who has tried to build and revive has been subjected to attacks from this demolition team.

Nuri Demirağ established an aircraft factory, but later they obstructed him and turned it into a gas stove factory. This country has experienced these events. Many brilliant minds who could not find a place in our country have unfortunately fled abroad, seeking ways to realize their projects in those countries. If you take a journey through newspaper pages, you will see how our national projects have been undermined, how they have been scorned, and how they have been tripped up in their crawling stages.

Dear brothers and sisters,

The same lobby continues its sabotage today. One of the targets of the Gezi events, which were initiated in 2013 under the pretext of 3-5 trees, was this airport; they wanted to prevent it and stood against it. The target of the December 17-25 coup attempt carried out by the parallel treason gang was not only myself and the government of the time but also our firms that put their hands under the stone for this project. We all remember the slanders made about Marmaray, the project of the century that we opened in the 90th year of our Republic; they said many things about it, and because of that, Marmaray opened with a delay of about 4 years.

You know, last week, our Ministry of Science, Industry, and Technology shared the first prototypes of our national car project with the public. Following this, some immediately headlined in their newspapers, 'not national but derived,' 'not local but fake,' trying to sabotage the project in its initial stage and discredit it. However, this work is being done in our country just as it is done worldwide. Similarly, those who applaud when another country builds an airport as a 'historic investment' immediately remember environmental and ecological sensitivities when it comes to Turkey.

What is in the jug will spill out. Unfortunately, when there is enmity towards the local and national within their jug, only that spills out. As Ziya Paşa said, 'The mirror of a person is their work, not their words / The rank of the person is visible in their work.'

We have spoken with our works until now, we have spoken with our services, we have spoken with the mega projects we have realized. We will continue to speak with our works, we will continue to speak with our services. We will continue to speak with our great projects like this, producing deeds, not words.

I want everyone to know, especially my citizens: Because today's Turkey is not the Turkey of the 1960s, 1980s, or 1990s. The periods of chaos, crisis, instability, and tension in Turkey are now behind us. The periods of being closed off, passive, and having the agenda set by 3-5 headlines, and politics designed are now in the past. Turkey will continue to resolutely implement the necessary works in every field in accordance with the 2023 targets.

As I conclude my remarks with these thoughts, I once again express my gratitude on behalf of my nation and myself to our Prime Minister, my ministerial colleagues, and our contractor firms who contributed to the realization of this project—who will now be both the operators of this process and one of the first consortia in the world to provide this service. I extend my thanks to all our architects, engineers, and workers who contributed to this project. God willing, as a state, we will support them at every stage of this project and will not leave them halfway.

I wish the third airport project to be a blessing for our country and our nation once again, I greet you with love and respect, and I entrust you to God.