Speech delivered at the Central event for Railway Workers' Day. Placetas, Las Villas,

Cuba Fidel Castro · President of Cuba

29 January 1975 · Central event for Railway Workers' Day · Placetas

Context
Castro addressed railway workers and youth brigades in Placetas, Las Villas, on January 29, 1975, to inaugurate the first section of Cuba's Central Railway reconstruction.
Main themes
Central Railway reconstruction, railway transportation infrastructure, Cuban economic development, history of Cuban railways, transportation systems, revolutionary industrialization, worker mobilization, regional development in Las Villas
Duration
~56 min
95th percentile
Words
6,684
95th percentile
Sentences
283
95th percentile
Readability
51
67th percentile
Grade
11.9
44th percentile
Syntax
3.19
72nd percentile
Vocabulary
2.10
27th percentile

Translated from Spanish

Content
Actors
Style

The broad sphere of national life a sentence belongs to. Every sentence has an Arena, so it is the denominator the other indices are read against.

Other
  • Economic 71%56%
  • Ceremonial 13%11%
  • Technological 5%4%
  • Social 4%4%
  • Institutional 4%3%
  • Geopolitical 2%2%
  • Environmental 0%0%
  • Not in focus 20%

283 sentences in 93 paragraphs

Comrades railway workers;

Comrades youth of the Young Workers' Army;

Comrades builders of the DAP;

Comrades workers in communications, agricultural workers;

Comrades from Placetas and the province of Las Villas:

The Revolution does not usually dedicate much time to the inauguration of works. In general, you know that there are many works being built throughout the country, and few times that these works are officially inaugurated; they are started and finished, and new works are continued. In the past, politicians generally dedicated themselves to inaugurating anything; but there were so few that they had plenty of time.

Why is this event organized to inaugurate the first section of the reconstruction of the Central Railway? Simply because this task, this work that has begun here, has great importance, great significance for our economy and for our people.

The railway system that the Revolution found is over 100 years old. The railway began in Cuba in 1837, in a section of the province of Havana, and it is said that Cuba was the seventh or eighth country in the world where the railway was first built; indeed, the first place in Latin America. It is also said that a railway was built in Cuba before it was built in Spain.

Then the railway development continued, as it was the only and fundamental means of transportation within the country. By the beginning of the century, the rest of the railway branches began to be constructed; this section of the Central Railway, I understand, was built in 1902, so it is over 70 years old. And in reality, our country had been lagging behind in terms of railways, and the railway in the conditions of Cuba is an irreplaceable means of transport. Given the characteristics of our island, long and narrow, with a length of over 1,000 kilometers, economically there is no transport system superior to the railway for long distances on land, both for cargo and for passengers.

In reality, our country must use different forms of transport, different systems: it must use ships —as is logical—, first of all, for international transport and part of national transport; it must use motor transport especially for short distances, and in certain circumstances for longer distances; and it must use railway transport.

In terms of navigation, the Revolution has made a great effort, acquiring a whole merchant fleet, which is also in full boom and development. In motor transport, the Revolution has built thousands and thousands of kilometers of roads and highways; even now the Central Highway is being built, from Pinar del Río to Santiago de Cuba. But it was necessary to make an important effort in the railway sector. And that is why, a few years ago, the decision was made to begin the relevant studies; and once those studies were completed, it was agreed to start developing the projects for the reconstruction of the Central Railway. And as soon as the first projects were developed, that reconstruction began.

Why is it called reconstruction? In part, it is completely new construction. In the section that is being reconstructed —of course saving a good number of kilometers, since it will be a straighter railway— it will reach a length of 850 kilometers between Havana and Santiago de Cuba. Approximately one third of that length will have a different layout, not very distant from the current one; but it is entirely new construction, as was done here in this section between Oliver and Calabazas.

Why was it started precisely here? Because in this region where we are was precisely the most difficult section of the Central Railway, the section with the most curves, and one of the sections with the most slope, only surpassed in the vicinity of Santiago de Cuba in this regard. But this was one of the places where the most problems arose for the operation of the railway, since trains had to leave part of the load in Santa Clara, or before reaching Santa Clara, in order to be able to transit through these places; that is, they had to lighten the load, and all traffic was considerably delayed.

In this area, a new layout for the train had to be made; it would not follow its old layout. And, therefore, this almost 25-kilometer section was completely newly built, which is now being put into operation, and which already avoids the great difficulties that the operation of the railway faced when transiting through this region. The most logical thing was precisely to start with this most difficult part. Furthermore, since it was a completely new section, it did not interrupt circulation, it did not force trains to divert.

That is why the strategy that has been followed is to start with the new sections, those that are newly constructed, where the layout departs from the old railway line, equivalent to approximately one third of what needs to be reconstructed. It is necessary to reconstruct not only the 850 kilometers; it is necessary to add to this the kilometers of all the stations and the sidings, and also to add some secondary lines that need to be built due to the new layout. In total, the reconstruction will reach, in this Central Railway program, 1,149 kilometers. It is necessary to build, or reconstruct, 1,149 kilometers.

Now, work will also have to be done on the old layout, on the old line to reconstruct it. Once these new sections are completed, work will begin in those places where the layout continues along where the railway was; that is, where the line actually needs to be reconstructed. That will bring another type of difficulties. There will not be such large earth movements, nor such large excavations, as in this area. In those places where the layout is considered good, work will be done on the current line, the embankment will be reconstructed, which will acquire the necessary requirements for the type of transportations that will be carried out on that route. And of course, that will bring inconveniences in the operation of the railway, since when work is being done on those sections, there will always have to be diversions of the railway, taking another line, either to the north or to the south. And of course, throughout this period of reconstruction of the Central Railway, we will have to get used to the idea that we will frequently have to divert from the main line until it is completely finished. In any case, that work will take a number of years.

Currently, there are eight brigades working on the reconstruction of the railway: one in Havana, another in Matanzas, three in Las Villas, one in Camagüey, and two in the East. Other brigades will need to be added. The initial calculations indicated a smaller amount of cubic meters to be moved. In total, almost 30 million cubic meters of earth need to be moved in those embankments, between the main line, the sidings, and the other lines that need to be built.

I forgot to mention that one of the characteristics of this railway is that the curves are much wider. It is said that the curves must have a radius of no less than 2,000 meters. Mathematicians understand that perfectly well. What it means is that the curves cannot be very tight, very sharp —as you say—, very pronounced; the curves must be gentler so that the railway can reach the appropriate speeds.

Currently, our railways run at speeds of 50 kilometers, 60 kilometers, and in some sections a little more. And the goal is to have a railway where trains, especially passenger trains, can travel at speeds of up to 140 kilometers per hour. And of course, that does not prevent the country from having faster trains in the future, since the embankments, which railway workers refer to as infrastructure, will be prepared for this. In any of these railway lines, the embankments must first be made as if they were a road, all the factory works, culverts, bridges, underpasses, and overpasses must be built, since it is intended that there will be no level crossings on this railway.

As you know, today all our railways have level crossings. And who has not encountered a railway on their way along a road? And how many accidents have occurred precisely at all those level crossings? And here we aspire to a high-speed railway that is also very safe; to a railway whose infrastructure, that is, whose embankment is already designed for even higher speeds and that has no level crossings. That is what is called the infrastructure of the railway.

The superstructure of the railway —which is another railway terminology— is when, once the embankment is built, the rails, the steel tracks are then laid. This requires the placement of the stone —which every railway line, every modern railway line has—, the sleepers and the rails. After that, the entire signaling system for the safety of the railway.

The infrastructure, that is, the embankment and its layout and design and its bridges and its routes without level crossings, would one day allow speeds of up to 200 kilometers per hour to be reached. But what would be required? Well, more powerful locomotives would be required. In two words, the electrification of the line would be required, high-power locomotives, and of course, an even superior superstructure. This railway, when finished, this line when finished, in the first stage will have rails, of course, much stronger than those currently in place; all the sleepers will be of prestressed concrete, with great resistance; elastic fastenings —that is another terminology of railway engineers—, which is the way they secure the rail to the sleepers.

Of course, even this section still has some wooden sleepers, since when the superstructure began to be assembled, the elastic fastenings were not yet available, and not all the sleepers were available. But, of course, the construction is being done on that basis.

All the sleepers, in the end, will be of prestressed concrete, all the elastic fastenings; the rail will be of a resistance and size suitable for those speeds of 140 kilometers per hour. Later on —and we must leave something for future generations; we cannot be so ambitious as to want to do everything—, the country can perfectly, on that same layout and on that same embankment, put even more powerful rails, electrify the line, and establish speeds of up to 200 kilometers per hour.

There would no longer be a need to do what we are doing now: reconstruct the entire embankment, make entirely new layouts, to modernize the railway. The railway will already be in conditions for further progress. But what is intended now with the reconstruction and modernization is to leave the infrastructure forever, and a superstructure suitable for speeds of 140 kilometers per hour, still with combustion locomotives, without the need to electrify the railway.

At first, it was considered whether we needed one or two tracks; whether the railway should be double-tracked or not. With the advice of Soviet technicians, who have great experience in all these railway construction matters, they analyzed it well and concluded that given the volume of traffic, even very large, that we could have in the future years, the problem could be solved with a single track; that it was unnecessary to build two tracks. That a large volume of circulation could be obtained on a single track, and a great safety in that circulation. Because sometimes we tend to think that on the same track, with many trains in one direction and others in another, accidents can occur. But mathematically, the possibility of an intense operation of a single-track railway is demonstrated, applying all the modern traffic control systems, and all the safety measures appropriate to that traffic.

So with a single track we can transport everything we need, in 1980, in 1985, in 1990, and later, for an indefinite number of years, without the need to make the costly investment of two tracks, which would really be largely underutilized. And that is why this very modern railway will, however, have a single track.

Of course, this is related to the entire system that railway workers call signaling. I am not an expert in these matters; I try to explain to you. If I read you something about this, perhaps you and I will understand a little better what they call the signaling problem.

"Signaling, blocking, and communications system. The installation of a system capable of ensuring the operation of the railway at the previously mentioned speeds is contemplated." That is, up to 140 kilometers.

"Signaling. The signaling system includes the automatic control of train circulation, as well as the automation in the work of yards and stations, through the signaling of the entire line, in what is called automatic blocking. That is, through signals placed every 2,500 meters, each train blocks the sections as it passes, which automatically change from red to yellow and to green, allowing the following train to continue.

"Likewise, the possibility of controlling a stretch of approximately 200 to 250 kilometers from the dispatcher’s cabin is contemplated" —the railway workers surely understand all this very well—, "which operates the various mechanisms, clearing the way and facilitating the circulation routes.

"This system allows for the safe transit of the equipment, and in our case, where a single-track layout is projected for the most part, it considerably increases its capacity.

"The system requires the laying of a 10-kilowatt electric transmission line along the entire track, which allows for the operation of signals throughout, as well as the activation of the various motors that move the switches, the barriers, etc. This 10 kilowatts is obtained from substations, which will draw energy from the national grid at various points, approximately every 100 kilometers.

"It is planned to equip the locomotives with signal repeaters, which means that the locomotive receives the signals from the track, repeats them on a panel, and automatically, in the event that the engineer does not respond to them, the signal acts by decelerating or stopping the machine.

"The dispatcher, in his control center, has a control panel that covers 200 to 250 kilometers of track, and exercises visual control over the entire operation, effectively coordinating the various crossings, and authorizing the departure of each of the trains in his system, in a way that ensures the most efficient protection.

"Simultaneously, there is absolute protection through the interlocking or protection system, interrelated mechanically and electrically, which prevents any type of error. In other words, at no time can a stretch of track be used by two trains traveling in opposite directions."

This gives you an idea of the technical level of the type of railway that is intended to be installed in our central branch. In addition to the fact that the train would have no level crossings anywhere and would have a strong fence on both sides of the railway, along its route, which would prevent the presence of animals on the tracks, as happens so frequently, and which is a cause of accidents. And, above all, if higher speeds are reached. Achieving higher speeds, you fully understand what it means for the economy, what it means in terms of saving time, equipment, and human resources, both in passenger transport and in freight transport. That is why it is logical to seek the maximum possible speed.

This means that we would have a truly modern railway, a very modern railway. It would undoubtedly be the most modern in any Latin American country. So, if at one time we were the first Latin American country to have a railway, now we will be the first to have a railway with such modern characteristics.

Of course, this railway program will not stop here. After this, we must continue working on all the so-called secondary lines: to the north, to the south, everywhere.

The effort from now until 1980 will focus on this central stretch, on the central line. Of course, work will be done on the maintenance and repair of the other branches, and each of the rails that are removed from here —the ones being laid now are completely new—, each of those taken from that old line will go to other branches, especially where the load is not so heavy, where the speed is not high. They will be used to improve, especially the sugar railways, since we have two types of railways: public railways and sugar railways, which are used for transporting cane; apart from the fact that both are used in the transportation of processed sugar, destined for various ports. All that material from the old tracks will be used to improve the entire general railway system.

We must then work on all the other branches. Even when we have made progress on the central line, we must start working on the other lines. And at the same time, we must advance work on the sugar railways, due to their great economic importance.

So here, on this day, we are truly concluding the first effort in this direction of a program that will take many years.

Now, we must complete this program for the reconstruction of the Central Railway by, at the latest, the next five-year period. In the period from 1976 to 1980, at the latest by the year 1980, to have the entire central track reconstructed and modernized.

We have been talking about the track; but the railway is not just the track. And what about all the works that the track requires? Once the track is established, there is the entire program of signals for the safety of the railway, which we mentioned; there is the whole issue of communications along the railway, of telephone lines, etc. But that alone is not the railway: alongside this program is the foundation to support the reconstruction and future maintenance. This requires establishing several industries; among them, a concrete sleeper manufacturing industry, with a capacity of one million sleepers per year.

In the future, the sleepers that our country will use will be made of concrete. There are plans to increase cement production, and we have no reason to use wood, which is of lower quality and must be imported, since our country does not have an abundance of wood. We will be eliminating wood from all our railway lines. And the earth-moving work for the installation of a plant capable of producing one million concrete sleepers per year has already been projected and initiated in the city of Santa Clara.

While that modern plant is being built, sleepers are being produced in other provisional plants, of course, with lower labor productivity, in a nearly artisanal manner. In these first years —especially 1975, 1976, 1977— we will have to work, making concrete sleepers in a relatively artisanal way. Of course, of good quality, because quality is achieved, but with very low productivity per worker and at a higher cost. Since it takes time to install that plant, during these first years, they will have to be made in smaller plants, where a larger number of workers are employed to produce sleepers of that quality.

We need to build stone mills, both for the production of sleepers and for all the ballast that must be used along the railway line. We need to set up sand washing plants, and we also need to make other important investments, such as the general railway reconstruction bases, which will lay the superstructure as the embankments are completed. There will be three of these bases: one in the Güines region, in the West; one in this region, where we are today, in the center; and another in the Cacocún region, in the East. These general repair bases will work on the reconstruction of these lines, then they will work on the reconstruction of the secondary lines, and at the same time, they will take care of the maintenance of the line. This is very important. Because it is not just about building the railway, but from now on, all necessary measures must be taken for maintenance.

Then there are important investments required in workshops for the operation of the railway. It is necessary to build a number of new workshops throughout the country, and to rebuild and expand the existing workshops. These are important investments that must be made.

Then we also need to build many new stations, and to rebuild or remodel some of the existing ones. We need to work on the entire station system, and I understand that there are about 53 stations along the 850 kilometers. Some need to be relocated, because the old stations from the early century in their current locations do not meet the needs of the railway. So, we need to carry out the relocation of the railway terminal in Santiago de Cuba; the relocation of the terminal in Havana; and the relocation of the stations in almost all provincial capitals. And all this in accordance with the city’s master plan, and with the criterion that the railway does not cross the cities.

Then we also need to make a huge effort in the railway stations. And also, especially with a view to freight transport, the loading and unloading centers that must also be built along the line. Ah, and I almost forgot, finally, about the investments that need to be made in new locomotives, in railcars, in passenger cars, and in freight cars. A large investment needs to be made in all of that.

The investment that is already being made in equipment for the operation of the railway amounts to more than 100 million pesos. Just in the equipment for operation.

There is also a significant investment being made in equipment for the construction and maintenance of the lines. Because you will remember that man working, those heroic maintenance work brigades for the railway lines, manually laying the sleepers, working with crowbars, picks, shovels. That, of course, must be absolutely surpassed, and that will be taken care of by the reconstruction and maintenance brigades of the railway, completely modernized.

53 machines have already been acquired for all those railway repair tasks. These are machines that, for example, automatically lay the sleepers. We saw one this afternoon. It is an expensive machine, requiring highly qualified personnel, with the productivity of 100 men, and that automatically lays the sleepers and rectifies the line. Everything that had to be done by hand before, all of that is now done with machines.

53 very modern machines have been acquired, some of which will work with the columns that will carry out the reconstruction, and others will be dedicated to track maintenance.

But the country has acquired equipment for these jobs like it has never had before, and some of the most modern in the world for this type of activity. This requires large investments.

So it is estimated that the total investment of this program for the reconstruction and modernization of the Central Railway requires investments amounting to 600 million pesos. It is a high figure. Of course, many of these investments —especially investments in workshops, in reconstruction bases, investments in equipment, etc.— serve not only for this work but will serve for all future work. That sleeper factory with a capacity of one million will be used in the reconstruction of the Central Railway, it will later be used in the reconstruction of the other branches of the railway, and it will be used for the maintenance of the railway lines for its entire lifespan. That is to say, it is an investment made now for the sake of reconstruction, but it is of lasting use. And the same goes for the workshops for the operation of the railway.

I told you that a total of 1,149 kilometers needed to be built. We need to build 1,115 culverts, 398 bridges, and if I remember correctly, 123 crossings, over or under the track.

It is truly a large project, a voluminous project, a serious effort.

Of course, doing this in other times, it is unknown how many tens of thousands of workers it would have required. But today everything is being done mechanized, all the embankment construction is with modern construction equipment, and the installation of the superstructure is with very modern equipment.

I told you that we had bought 53 pieces of equipment for construction and maintenance. To this, we must add a good number of other equipment that is dedicated more to the actual construction of the superstructures than to maintenance. That is why the number of men would be relatively small for such a large project, given the level of mechanization employed in this work.

Then we have in our favor the fact of cooperation among all sectors, as has happened here: everyone worked here, and we know that the neighbors of this region also helped; that the agricultural workers helped in the placement of the fences, like 50 kilometers of fence, because there is a fence on each side; the neighbors of Placetas and this Cumbre region also helped in various tasks to complete this stretch; and, of course, the workers of the DAP, of the railway embankment construction brigade made a great effort. They initiated the work, because it was their responsibility to do all those excavations and build the embankment and the bridges.

Once they finished, immediately, with great efficiency, the comrades from the Youth Labor Army set to work on constructing the superstructure.

Because it is not a single force that builds everything. This is not a road; when it is a road, the DAP does everything; here the embankment is done by the DAP, and the superstructure is built by the railway. There, of course, railway track and works workers are working, and this youth force that has been organized through the Youth Labor Army to build those superstructures. The communication comrades have worked on the communications.

This stretch is now completely finished. However, in the end, we will have to come back here for the part that has wooden sleepers and replace them with concrete sleepers. In the end, we will have to come back here.

But, in addition, I almost forgot to tell you something. As you can see, now they do not lay sleepers just for the sake of it, but there are workshops where a track is assembled. What does a track mean? Well, a complete rail, on each side. It already comes with its sleepers mounted and is laid down; that is a novelty, isn’t it? The complete track comes ready, and it is laid down. That is one system.

But in the future, by the end, it will not be laid down like that; the rails will be welded. That is to say, there is a welding plant that is also going through this region —I understand— that will have the task of welding the rails. And then a rail will have a length of 600, 700, and I believe even 800 meters. And then you will not feel that rattling, which is the train jumping every 12 meters —the length that a rail generally has—; the train always makes a peculiar noise that is typical when it jumps from one rail to another. So it will be more comfortable, you will be able to sleep more peacefully on one of those modern trains, since it will travel on welded rails of 600, 700, and 800 meters. You will see trains loaded with those welded rails of 600 to 800 meters long crossing here —especially the neighbors— and the specialized machines that load those rails and also lay them down. Our farmers and the neighbors of the railway will see all that hustle and bustle of equipment, machines, rails, tracks, everything. It is truly very interesting.

Of course, all this construction requires a shock brigade. The comrades from the Transport Union proposed that they will form a shock brigade of 120 men who will work with the spirit of the sugar cane brigade "57th Anniversary of the October Revolution". There is no doubt that this will be a great contribution to this work, because in this work, we must work with that spirit.

But, in addition, our Youth, our organization of young communists has among its shock works this work of the Central Railway. They have selected a number of shock works for the next five years, and one of them is precisely this beautiful work of the reconstruction and modernization of the Central Railway. So that support from our communist youth to this task is very useful and very important, because these are the tasks of the current hour.

In other times, when the struggle began, the task was war: the war against tyranny, the war against the armed enemy; today our youth has other tasks. Of course, they must defend the country above all, and that is not neglected at all. But their battle, their struggle, their war today is precisely against underdevelopment, against poverty; the war is the great battle for the economic development of the country, for modernization and for the advancement of our homeland. And that, of course, is not achieved with words, but with sweat, with effort, with a very large investment of human and revolutionary energy.

It is very beautiful to see a section already finished, a train passing, a modern locomotive crossing those steel paths. But how much work it costs! How much effort, how much energy for weeks, months, and whole years! From the moment the surveyors start studying the layout and the designers carry out the project, the builders perform the different tasks and reach the end with the completed work.

There is no doubt that our country will be able to feel proud in the future of that Central Railway. But that is one of the works that can only be carried out with determination, with energy, with effort, with will, with courage, with heroism. And there our youth will have a magnificent stage to serve the homeland.

But the reconstruction —as we said earlier— is not everything. We cannot forget the operation of that railway for a second afterwards. That is why we aspire for many of the young people who participate in its construction —a significant part of them— to continue in the railway sector, so that from the ranks of the Youth Labor Army, experts in track construction emerge, since we will be building tracks for many years; and that part of the qualified workforce, of a high level, that we need for the operation of those railways also comes from among them.

It is necessary to give the railway sector an important injection of new blood. It is necessary to support the work of the selfless railway workers who have maintained this very important activity for decades.

But the railways, it seems, were forgotten; the railways, it seems, were a thing of the past. There was no interest or attachment to the railway among our youth.

But the time has come for our youth to contribute to the railway. And just as thousands of young people are joining our shipping fleets and our fishing fleets —without whom it would be impossible for our homeland to develop those very important branches of the economy today— the contribution of our youth and the incorporation of our youth into railway activities is needed.

That railway we were talking about a moment ago is no longer the old railway; a much higher level of preparation is required. Already any of those dozens and hundreds of machines for building, maintaining, repairing, and operating the railways are much more modern machines. It is no longer the crowbar, it is no longer the hammer; they are very expensive equipment that requires very qualified, very prepared personnel. All those tasks of operating a modern railway, with all those signaling systems, with all those automatic mechanisms, with all those control methods, demand, require very prepared personnel. And not only technically well prepared, but also very serious personnel, very well prepared morally, politically, and revolutionarily.

In general, the imperialists underestimated our peoples; they believed us incapable of good organization, of good discipline. They believed us incapable of the responsibility necessary for all that. And in many areas, we have already demonstrated how wrong they were. Right now we are demonstrating that we are capable of building a well-modernized railway and that we are capable of operating the most modern machines in that task; but afterwards we will also have to demonstrate our ability to operate that railway with maximum efficiency. So that our railways in the future, when they have been modernized, are fundamentally characterized by seriousness and efficiency, by a sense of responsibility and by discipline. And that effort will be judged by the efficiency with which the railways operate, by the punctuality of our railways. I do not say this now because we do not have the appropriate conditions; the difficulties are many, although now we do have to be very careful and very responsible and as punctual as possible. But with the conditions that will be created, it will allow us to have a railway system so modern, so well equipped, that it can operate with the precision of a clock, of a clock that works well, of a clock that neither runs fast nor slow.

Our railways will require countless technicians of all levels, university technicians, middle-level technicians, and highly qualified workers. And we know that this raw material exists in our country. But in addition, the railway sector has great revolutionary and patriotic traditions. We must take from the old generations of railway workers their spirit of sacrifice, their selflessness. They have maintained the operation of those railways under difficult conditions during all these years of Revolution. Our youth must take from them their example and their virtues, while also bringing their new blood and the indispensable technical knowledge that will be required for the operation of those modern railways. To manage and operate these railways, one will have to study, and very seriously; because otherwise, it would be impossible.

That is why on this day, which has justly been consecrated for its historical importance as Railway Workers' Day, we must make the commitment to achieve those objectives, to achieve that sense of responsibility, to achieve that will for efficiency. We must make the commitment to acquire the knowledge that is required and that our people need to optimally operate those railways. In two words: this day must serve to initiate a new railway consciousness in our homeland and for our youth to take that flag, that noble purpose into their hands! This day must also serve as encouragement to all railway workers and to the brave builders of our railway.

Today we have remembered all those who have worked on this project. It is also fair to remember the technicians; those who worked on all the studies and in the preparation of the projects. And finally, in a very special way, we must express our gratitude to the dozens of Soviet technicians who worked and are working on the projects for the reconstruction and modernization of this line.

There, too, in the great homeland of Lenin, the Soviet people dedicate their efforts to the construction of a gigantic railway project, which is the Baikal-Amur railway that will have more than 3,000 kilometers of route. We can imagine the enormous technical and engineering difficulties that will be encountered in that work, crossing mighty rivers, traversing mountains, and building along hundreds of kilometers of jungle and snow, practically uninhabited. It is a great effort. It has been a coincidence that we are coinciding precisely with them there, in their great railway construction and us in our great railway construction, limited, of course, by our size and by our scale.

We must say that without the collaboration of the Soviet Union, our people would not have been able to undertake this railway task, since many of the construction equipment and many of the operating machines are of Soviet origin. And the Soviet Union supplies us precisely with one of the fundamental elements for the construction of the railway, which are the rails. And it has provided us with credits and resources to carry out this work, which will undoubtedly constitute a work of immense benefits for our people, and will be one of the many evidences of the accelerated progress with which our homeland is moving today. And one of the fundamental tasks of the important five-year period from 1976 to 1980, where undoubtedly our homeland will move even faster along the path of development.

Right now, one of the freight trains is crossing the new line. There are two things: a locomotive that has started and a train that is coming this way.

They say it is coming with 2,000 tons of sugar, it is coming with two locomotives and 40 cars loaded with sugar. Of course, that shows that the locomotives are still not powerful enough to pull those cars with just one. (THE TRAIN PASSES).

We want to take advantage of this day to also congratulate the workers of Villa Clara for the magnificent spirit with which they have welcomed all the tasks the Revolution has assigned to them. Yesterday they fulfilled their duties in the war, for the triumph of the Revolution; then they fulfilled them defending the Revolution, because it was our agricultural workers, our industrial workers, and our peasants who crushed the mercenary bands that once tried to obstruct the path of the Revolution.

Look at Escambray today, which they wanted to turn into a den of bandits and which became a scene of crimes like those of Benítez, those of Ascunce, those of many other revolutionaries; what Escambray is today: its rhythm of development and progress, and what this province is today: its enthusiasm, its spirit of work, its will to advance, which is seen everywhere; the thousands and thousands of Villa Clara residents who have joined the construction tasks, building roads, factories, housing, schools, dairies, and all that set of works that are rising everywhere in this province. Congratulations for the brilliant sugar effort they are making to their macheteros and their operators of combines and equipment cutting the cane, lifting it and transporting it, and their industrial workers from the mills, who strive to optimize the harvest to extract every last gram of sugar, to combat the effects of the drought, which has been one of the harshest that the country has suffered in recent years, to take advantage of the good prices that sugar has now, and to have resources to continue developing, to continue advancing.

We hope that the Highway, the embankment of the Highway, will connect Havana with Santa Clara by the end of this year. A group of Villa Clara brigades is committed to that important work, which is also advancing rapidly.

Also, one of the Villa Clara industrial construction brigades, the one that is going to build the cement factory in Cienfuegos, took first place nationally.

And in this province, we celebrate today Railway Workers' Day and inaugurate the first section of 25 kilometers of the reconstruction of our Central Railway.

For all these efforts, for all these successes, we congratulate you. We congratulate all the people of Villa Clara, we congratulate all the workers and laborers of Las Villas; we congratulate the Party of this Villa Clara province, its Provincial Committee, and comrade Arnaldo Milián, First Secretary of the Party in the province.

This has been a very happy day for all of us. And just as we see how projects become realities, how ideas turn into facts, we have no doubt that in the coming years, during the next five-year period, this reconstruction of the central railway will be completed, and that the railway workers will also gather somewhere in the Republic, alongside the people, to inaugurate their finished work.

Homeland or Death!

We will overcome!