Speech at the opening of the Poland-Lithuania gas interconnector

Poland Andrzej Duda · President of Poland

5 May 2022 · Opening of the Poland-Lithuania gas interconnector

Context
Duda addressed leaders at the opening ceremony of the Poland-Lithuania gas interconnector on May 5, 2022, emphasizing energy security amid Russian gas cutoffs.
Main themes
Poland-Lithuania gas interconnector, energy security, Russian gas blackmail, diversification of energy supplies, Baltic states integration, LNG terminal Świnoujście, Baltic Pipe Norwegian gas pipeline, Gazprom as political instrument, European Union energy dependency on Russia, Russian invasion of Ukraine, infrastructure investment
Duration
~11 min
39th percentile
Words
1,335
39th percentile
Sentences
40
25th percentile
Readability
38
30th percentile
Grade
15.6
80th percentile
Syntax
3.47
93rd percentile
Vocabulary
2.06
19th percentile

Translated from Polish

Content
Actors
Style

The broad sphere of national life a sentence belongs to. Every sentence has an Arena, so it is the denominator the other indices are read against.

Other
  • Geopolitical 62%60%
  • Ceremonial 23%23%
  • Institutional 8%8%
  • Economic 5%5%
  • Social 3%3%
  • Technological 0%0%
  • Environmental 0%0%
  • Not in focus 3%

40 sentences in 23 paragraphs

Your Excellencies, Honorable Presidents, Excellency, Madam Representative of the European Commission, Honorable Ministers, Members of Parliament, Senators, Honorable Voivode, Honorable Presidents, All Distinguished Guests!

In Poland, we have a saying: a wise Pole after the damage. We often say this about ourselves because it seems to be in our nature that we frequently think, "It will somehow work out, there’s no need to worry in advance, when it’s necessary, we will do it." And then it is usually too late – we act when something happens, and our action is a response. But usually, we have to bear the losses associated with the waiting period and the realization of what has long been needed but was not done until the damage occurred.

I want to sincerely thank the Presidents, I want to sincerely thank the Ministers – all those who contributed to the construction of this gas connection between Poland and Lithuania, but in fact – between the European gas system of the European Union and Lithuania, and thus also the Baltic states.

Thank you, because today we are witnessing a solemn opening, although we know perfectly well that gas has been flowing for several days. This time, the Pole is not wise after the damage, but together with our Lithuanian neighbors, together with the European Commission, we have proven to be wise before the damage.

A few days ago, the Russians blocked gas supplies directly to Poland. We have already seen such images in Ukraine at the beginning of the 21st century, and it was on this basis that Poland concluded at that time that we must secure ourselves. Thanks to the wisdom and insight of President Lech Kaczyński, we then began a great investment, building the LNG Terminal in Świnoujście, which today provides a significant part of Poland's annual gas demand.

But at that time, we also started a discussion about interconnectors, and soon after, their construction began, meaning the investment processes started.

Today, this gas pipeline, the interconnector between Poland and Lithuania, is a fact at a moment when Russia has made another attempt at gas blackmail – it is, in a sense, a response to it. A ready response. Most importantly – a ready one.

In the whole situation resulting from the Russian invasion of Ukraine, which – inevitably – leads to the conclusion of the necessity to formulate a significant response to Russia's behavior, such a response that will stop Russia, there is an ongoing discussion about limiting or even ceasing the purchase of energy resources from Russia: gas, oil – the most important ones.

It turns out that in the vast majority, Europe, the European Union is not ready for this – precisely due to the years of conscious dependency created by Russia on the supplies to the countries of the European Union. For years, we have heard in the European Union the rhetoric about Russia as a serious economic partner, about Russia as a reliable, responsible partner.

Unfortunately, for many years, no words were spoken to explain what Gazprom is – that it is not a normal company operating on market principles, as democratic Europe is accustomed to, or more precisely: Western Europe; that it is not a normally functioning enterprise; that it is not simply a company focused on achieving the best financial results, aimed at financial profits; a company that would operate solely on an economic basis.

No! It is simply the hand – on one side – economic, but on the other – also military of the Russian state, the Russian authority, which, if necessary, does not achieve economic results, but instead achieves political results by expanding Russian imperialism, by strengthening Russian imperial policy.

Thanks to such investments as this one, we ensure an alternative, we ensure the possibility of supplies from other directions than just the Russian direction.

I am extremely pleased that this interconnector, which allows for the transmission of gas in both directions – both from Lithuania to Poland and from Poland to Lithuania – will serve us and will significantly ensure this diversification not only for our countries but also for our neighbors and the European Union.

Of course, this is not the only investment in this area that we are currently implementing. In addition to the LNG terminal in Świnoujście, which has been functioning excellently since 2016 and which we are currently expanding – it initially had a capacity of 5 billion cubic meters per year, today we are expanding it to a capacity of 7.5 billion cubic meters per year – we are primarily implementing a great investment, long planned and already, unfortunately, postponed due to erroneous decisions made by Polish authorities in the past, namely: the gas pipeline from the Norwegian shelf through Denmark to Poland.

We hope that the work will be completed on time and that this gas pipeline will be fully ready by autumn this year, capable of transmitting gas from the Norwegian shelf to Poland, thus providing another way to supply the European gas system. I hope that thanks to the interconnector that was established today between Poland and Lithuania, this gas from the Norwegian shelf – if necessary – will also be able to flow to Lithuania and further to the other Baltic countries.

This is a great investment: 508 km of gas pipeline thanks to the support of the European Commission and the European Union, which, under the Connecting Europe program, significantly helped financially in the realization of this great undertaking, we have this work completed – thanks to the commitment of people who understood that we need to have various options for supplying gas to our economies, our countries, or, ultimately, our homes.

Once again, I want to thank everyone who contributed to the realization of this great investment project. Thank you for being on time, that is, when these gas supplies are really needed, and that thanks to the efforts of all those who built this gas pipeline and who are today building other gas connections, we could calmly accept the Russian information that gas from Russia will not be sent directly to Poland; that we are able to cope with this; that we were not intimidated, we were not blackmailed.

Today is a symbolic day: May 5, just two days after a very important day for us – Poles, Lithuanians, for the residents of our part of Europe, here, once the former Commonwealth of Both Nations – the Constitution of May 3, which once aimed to help save that Commonwealth, to help repair its system, to help save the state precisely from, among other things, Russian aggression, Russian imperial appetites.

At that time, it did not succeed. The Constitution was created – a great work of contemporary political and legal thought – but, unfortunately, it was created too late. In fact, it was no longer possible to implement its provisions. Russia was faster and, along with other partitioners, destroyed that First Commonwealth – the Commonwealth of Both Nations.

I am glad that today, practically on the 231st anniversary of the Constitution of May 3, we are launching a joint work that is not late, that is ready, is on time, and which does not repair but builds, connects Poland and Lithuania, connects Europe, which significantly strengthens our security.

I hope, Mr. President, Honorable Presidents, that we will also realize the two remaining great communication projects relatively quickly – because this gas interconnector is a kind of communication, it enables transmission – I am thinking of Via Baltica and Rail Baltica: two extremely important investment projects that are underway, which will cause a real, visible, and tangible connection for every ordinary citizen between Poland and Lithuania, between Poland and the Baltic countries.

I am pleased, Mr. President, that we are implementing these great plans, I am pleased that we are doing it consistently, and once again, I thank you for the invitation to today’s ceremony. It is a day of great joy for all of us.

Thank you very much.