We received the last 8 trains of the Sarmiento Line.

Argentina Cristina Fernández de Kirchner · President of Argentina

11 August 2014 · Presentation of 8 new train sets for the Sarmiento Railway · Port of Buenos Aires, Buenos Aires, Argentina

Context
Fernández de Kirchner spoke at the Port of Buenos Aires on August 11, 2014, presenting the final 8 new train sets completing the Sarmiento Line's 25-unit fleet renewal.
Main themes
Sarmiento Line train fleet renewal, public transport modernization, Mitre Line expansion, colonial extractive economic legacy, federal integration and connectivity, infrastructure investment, Argentine railway history, national development model
Duration
~9 min
33rd percentile
Words
1,120
33rd percentile
Sentences
48
31st percentile
Readability
61
90th percentile
Grade
10.5
26th percentile
Syntax
3.36
87th percentile
Vocabulary
2.04
16th percentile

Translated from Spanish

Content
Actors
Style

The broad sphere of national life a sentence belongs to. Every sentence has an Arena, so it is the denominator the other indices are read against.

Other
  • Economic 52%52%
  • Ceremonial 25%25%
  • Social 17%17%
  • Institutional 4%4%
  • Geopolitical 2%2%
  • Technological 0%0%
  • Environmental 0%0%
  • Not in focus 0%

48 sentences in 15 paragraphs

Cristina Fernandez de Kirchner and Florencio Randazzo presented 8 new train sets for the Sarmiento railway at the Port of Buenos Aires. Monday, August 11, 2014.

See more photos of the new Sarmiento Train: Facebook

Good afternoon, how are you: the last 8 train sets have arrived, which will complete 25 new sets for the Sarmiento Railway. We estimate that by mid-September all 25 new sets will be in place. The increase is already noticeable with the incorporation of the new sets. We are now at 17 sets – from the original 12 – even though some of the old ones, which are 50 years old, are still in service. It is already evident that people are not traveling so cramped, they are not packed in so tightly, and I believe that when in September, in the month of spring, we have all the sets on the tracks, things will be much better.

And I also want to announce that we are continuing, because there were many demands from passengers on other lines who were asking us: “What about us, when?” Well, we are moving on to the Mitre now. The Mitre is the second, and some of the Mitre sets are already being shipped from China. We estimate that in 20 more days, that is, by the end of August or the beginning of September, the first sets of the Mitre, which are 30 sets of six cars, totaling 180 cars, will be arriving. We estimate that by November or December, we should have the Tigre – Retiro line completed with all the new sets. So, well, fulfilling… oh, it sounds good outside, because I realize that everything resonates with the drums, and the truth is that this is a long-cherished dream, and really all the comforts we can see, from the people who can lean when standing and everything… there are people honking their horns from the passing trucks.

This really allows us to enter a new phase, which the other day when we also presented the plan to renew short-distance transport, the motor passenger transport, which is the oldest we have, I mean, it is newer than when we started renewing it in 2005, we were at it for 9 and a half years, and now we are at an average renewal rate, at the national level, of 7 and a half years, and here in the AMBA of 5 and a half years, with a line of credit for buses with subsidized rates – through Banco Nación – that we hope can be used soon.

But today, having the last cars of the Sarmiento here, and in a few days having the Sarmiento completely new, which as you know is the line that transports the most passengers, approximately 300,000 per day, is truly a marvel and being able to share it with the rest of the Argentines. And I say with the rest of the Argentines because we also have to remember our brothers in the deep country who still do not have these railways, and we still have to keep working hard because from a country that was so connected by rail, it must also be said, connected all towards the Port of Buenos Aires, in a radial manner. There was no interconnection between the provinces because it was designed for an extractive economy, extracting our primary resources, and so the British designed a railway that came from all points of the country, converging at the Port of Buenos Aires, and from the Port of Buenos Aires, all the raw materials were sent to be processed, manufactured, and value-added in England. That is how the Argentine railways were conceived. And also the gas pipelines. Everything was thought of that way.

For example, in terms of energy, we had to start connecting province to province because suddenly, it was not just that you had to fly with Aerolíneas from Río Gallegos to Buenos Aires and from Buenos Aires then go to… It was incredible, but to go from Gallegos to Bariloche, you had to come from Gallegos to Buenos Aires and from Buenos Aires to Bariloche.

Well, everything related to transport has been not only renewed, as in the case of Aerolíneas, where today we have a model airline that competes with the private sector and is yielding better results, even than the private sector, but also in terms of trains, in terms of energy, redesigning a federal country. Ultimately, interconnecting and integrating among ourselves, because we were really always looking outward.

If you look at all the capitals of South America and generally those that were colonies, they always had their main cities next to the ports, next to the ocean to be able to export everything. In contrast, industrialized and developed countries have their capitals where? In the center of each country. Look at where Madrid is, look at where Paris is, look at where Berlin is, all located in the center of the country. Those are models of developed countries.

This also has to do with the conception we had, and the railways, gas pipelines, oil pipelines, electricity lines, electric transport lines, should not respond to a different model. It was a growth pattern that had to do with the extractive, little inward and much outward.

Well, this is what we are reversing, and we are also reversing it because later, when all that deteriorated, it not only remained that way, but nothing was done either. We had no new gas pipelines, no new transport lines, no new buses, no new planes, the ones we had were taken away, we all know what the history of the privatization of Aerolíneas Argentinas was. Well, the railways were all absolutely dilapidated, derailed, and old. I mean, everything from scratch and starting over.

So, well, we are very happy to be able to share this with you. Well, when we launch on the day… What day in September, do you have a date? 14, what is September 14? There is a date September 14, we will set a date. September 14, what day is that? It would be fantastic, because I love Wednesdays, please, someone, someone quick, quick guys, Sunday. Monday the 15th, the pretty girl is the 15th, yes the 14th is the drunk, better not.

Let’s go for the pretty girl, Monday the 15th to inaugurate the complete Sarmiento, fully operational, with new tracks, with new signaling, everything much safer, better, more modern for all Argentines.

Well, thank you very much for joining us, this is also yours, some of you may travel on the Sarmiento or on some other line. So, this is also for you.

Okay, thank you, thank you very much.