12-12-2012 - Speech by the President of the Republic, Dilma Rousseff, during the opening session of the 81st General Assembly of the UIC (International Union of Railways)

Brazil Dilma Rousseff · President of Brazil

12 December 2012 · 81st General Assembly of the UIC (International Union of Railways)

Context
Rousseff addressed the 81st General Assembly of the International Union of Railways (UIC) in December 2012, outlining Brazil's ambitious railway expansion and investment opportunities for the private sector.
Main themes
Railway infrastructure expansion, freight transport investment, public-private partnership model, transportation matrix rebalancing, high-speed rail, urban passenger transport, logistics planning, port system integration, Brazil's Growth Acceleration Plan, metro investments in major cities
Duration
~7 min
23rd percentile
Words
821
23rd percentile
Sentences
38
24th percentile
Readability
48
56th percentile
Grade
11.7
41st percentile
Syntax
3.05
54th percentile
Vocabulary
2.16
39th percentile

Translated from Portuguese

Content
Actors
Style

The broad sphere of national life a sentence belongs to. Every sentence has an Arena, so it is the denominator the other indices are read against.

Other
  • Economic 82%82%
  • Ceremonial 13%13%
  • Geopolitical 3%3%
  • Institutional 3%3%
  • Social 0%0%
  • Technological 0%0%
  • Environmental 0%0%
  • Not in focus 0%

38 sentences in 13 paragraphs

In fact, Brazil has an extremely unbalanced transportation matrix. A continental country cannot be fundamentally connected by highways. What happened in 2007 in Brazil is very important. We had a clear perception of the importance of the railway system in Brazil. We had to revive this railway system that had been, in fact, practically neglected in recent decades.

From there, we launched a plan for railways, which was part of the Growth Acceleration Plan, and it aimed to build 5,000 kilometers of railways in Brazil. Basically, the longitudinal axis that cut through Brazil from North to South. We also built this railway called North-South, which connected with some railways in a transversal direction, East-West, that basically articulated the production of minerals and grains and made this production transportable throughout Brazil.

Recently, we considered that for the development of Brazil, it is essential to take a step forward. First, by building a company, which is a planning company and not an investment company, aimed at thinking about the integration of modes and the Brazilian port system, the EPL, Planning and Logistics Company. This company will help us build our next challenge, which is 10,000 kilometers of railway network.

And for that reason, we launched an investment plan in logistics through which we intend to invest 91 billion reais in the short term, in freight railways, in addition to the 5,000 that are already underway.

The model we adopted is extremely friendly regarding private investment. It first divides the risk... it assumes the demand risk as EPL purchases the capacity, contracts the construction of the railway, and buys the capacity. And it ensures the right of passage through, obviously, the payment of an appropriate price for the right of passage. In such a way that, in the event of demand risk, the one who assumes it is this EPL company, making the investment safer and more interesting for the private sector.

At all stages, we believe in the importance of the presence of the private sector, both the railway sector based in Brazil and those who may want to come to Brazil. And this is very important. Ten thousand kilometers for Brazil is very little. We are, therefore, in the first stage of this project, which is basically a freight transport project.

As for passenger transport, tomorrow – tomorrow, the 13th – tomorrow, we are launching the bidding for the choice of the technology for the high-speed train, which will connect the two largest... the two largest producing regions of both manufacturing and the largest GDPs in Brazil, which are São Paulo and Rio.

This does not mean that we will stop at the high-speed train - as Guilherme, who is well-informed about our projects, rightly pointed out. This does not mean that we will not continue to complete these investments in passenger transport. This is because the high-speed train is part of a larger problem that is also to address the urban issue in the two largest cities in Brazil. And, obviously, it will create a whole opportunity for relocation along this stretch that connects the 510 kilometers from São Paulo to Rio. Porto Alegre, which is in the far south of Brazil, has significant investment in the metro, including to enable the presence of these cities in the World Cup. Further north in Brazil, Curitiba, Belo Horizonte, Salvador, and Fortaleza currently have significant investments in the metro.

And as we have medium-sized cities - above 2 million inhabitants - in these medium-sized cities, the passenger railway system is the only alternative to congestion and urban chaos in transportation, mainly because it is a fact that Brazil has bet on private transportation, on individual transportation for each person, which is extremely uneconomical from the perspective of restructuring urban space.

A city like São Paulo, like Rio, like Belo Horizonte, like six to seven Brazilian cities, need transportation based on subways or trains to be viable.

So, I am very pleased to be here today, which is why I accepted the invitation. Because I believe that the International Union of Railways, this meeting here has a great dialogue to establish with Brazil. A dialogue that will enable, for you, investment opportunities. A dialogue that will ensure stability for these investments, security for these investments, on one hand, and a dialogue that will provide Brazil with the necessary conditions not only to structure its transportation system suitable for the challenges of the 21st century but, above all, to allow its population to have more efficient transportation.

Tomorrow, the 13th, today is the 12th, right? Tomorrow, the 13th, we will be conducting the first phase of the auction for the high-speed train. It would come, if this event had not coincided with our bidding tomorrow. And I want to tell you that throughout 2013, we will have several auctions and various opportunities for railways to participate in logistics investment in Brazil.

Thank you very much.